Back to All Schemes
Utility & SanitationState/ UT Level

World Bank-funded Uttarakhand Drinking Water Programme (For Semi-Urban Areas)

The scheme aims to provide affordable and reliable domestic drinking water connections to eligible households in selected semi-urban areas of Uttarakhand, ensuring improved access to safe and adequate drinking water.

Authority

State/ UT

Region

Uttarakhand

Status

Active / Open

Updated

Recently Verified

What are the Benefits?

Under this scheme, domestic water connections are provided by depositing a nominal connection fee of ₹1.00 and an application fee of ₹25.00.

Who is Eligible?

The World Bank–funded Uttarakhand Drinking Water Supply Programme for Semi-Urban Areas provides benefits to families residing in selected semi-urban regions of the state.; The programme is not applicable in urban areas.

Required Documents

Aadhaar Card
PAN Card
Income Certificate
Residence Proof (Domicile)

Common Questions

Who is eligible for this scheme?

Families residing in selected semi-urban areas of Uttarakhand, whose water supply scheme has been constructed by Uttarakhand Peyjal Nigam or Uttarakhand Jal Sansthan, are eligible. The scheme does not cover urban areas.

How can one apply for a drinking water connection under this scheme?

Applicants can obtain the application form directly from the nearest departmental collection centre and submit it with the required documents.

Is there an application fee for availing the connection?

Yes, a nominal application fee of ₹25.00 is required to apply for a domestic water connection.

Is the scheme applicable in all areas of Uttarakhand?

No, the scheme is only for selected semi-urban areas. It does not apply to urban areas.

How many semi-urban areas are covered under this scheme?

A total of 22 semi-urban areas are covered, including 15 under Uttarakhand Peyjal Nigam and 7 under Uttarakhand Jal Sansthan.

What is the processing time for providing a water connection?

After document verification, the department provides the drinking water connection within 15 days.